Nancy asked us all to be out of the park before 9. We got up at 7 and had our coffee.
I only had to unhook from water and power and hook up the Jeep. Gerri got the inside ready to travel.
|
Along the road |
Once on the road we didn't hurry. With only 336 km to travel we will be there early in the afternoon. After a short detour near the park we were on TCH-1 most of the way. Good road except for a couple of delays for construction. Gerri experimented with taking some videos through the windshield as we traveled.
|
The Confederation Building |
We arrived in Pippy Park a little after 1. Our site was a pull through with 50 amp electric service. We may not need it, the weather is a little cool with the sun coming and going as the clouds move overhead. I mopped the floor inside before Gerri put out the carpets and she ran the sweeper on the rugs. I also spent some time cleaning the Jeep.. I may get ambitious in the morning and clean the coach. The windshield is so dirty Gerri gave up trying to take videos through it.
|
In Pippy Park |
Gerri made spaghetti and meatballs for dinner. After dinner Moe and Pat came by and we visited with them for a while. They had tried a geocache on a path in the park but didn't find it.
No comments:
Post a Comment